They've been naughty boys, havent they Mr. Flibble
Offline
Posts: 7,474
Join Date: Feb 2007
Location: Devon, England
04.01.2007, 04:53 PM
Simple- set the truck up like you would normally run it, hold the castor block level, then measure the distance between the closest holes on the castor block & chassis mounting point for the link rod- this gives you the hole to hole length. Then look for a rod which matches, and it can be lengthend/shortened by rotating the ends in the usual way.